NORMALIZE BEFORE YOU RANK
Copy each proposal into the same matrix. Mark every row included, excluded, allowance, provisional, owner supplied, separate contractor, or unclear before comparing totals.
| Work package | Details to compare | Status |
|---|---|---|
| Design and approvals | Plans, engineering, survey, permit preparation, fees, comments, revisions, inspections | Included / excluded / allowance / unclear |
| Site and access | Demolition, protection, excavation route, soil handling, rock, groundwater, utilities, restoration | Included / excluded / allowance / unclear |
| Pool system | Dimensions, depths, structure or shell, reinforcement, base, finish or liner, fittings | Included / excluded / allowance / unclear |
| Equipment and utilities | Exact models, hydraulics, controls, cleaner, sanitation, heat, electrical, gas, commissioning | Included / excluded / allowance / unclear |
| Surrounding work | Coping, deck, drainage, barriers, lighting, landscaping interfaces, cleanup | Included / excluded / allowance / unclear |
| Commercial controls | Allowances, exclusions, taxes, milestone evidence, payment timing, changes, substitutions | Included / excluded / allowance / unclear |
| Delivery process | Responsible manager, supervision, trades, schedule, inspections, corrections, reporting | Included / excluded / allowance / unclear |
| Closeout | Startup, training, punch list, final approvals, manuals, registrations, warranties, records | Included / excluded / allowance / unclear |
DECISION MEMO
PROPOSAL FAQ
Choose only after normalizing scope, products, assumptions, allowances, exclusions, delivery controls, and closeout. A lower total may describe materially less work or more uncertainty.
There is no universal number. Seek enough qualified and responsive candidates to understand meaningful alternatives, then compare consistent written information.
It is a placeholder for a selection or work item that is not fully specified. Ask for the product, quantity, labor, delivery, tax, and installation basis.
Treat it as unclear, not included. Ask for written clarification and share material scope changes with other bidders if the comparison process is still open.
Not necessarily. Confirm what documents form the final agreement and review the complete contract under applicable local requirements before signing.